Of their quotation, the IFLA-APR jury described the proposal as demonstrating “bold considering and design integrity,” including that it confirmed “excellent design innovation, sturdy environmental stewardship, and constructive neighborhood affect.”
Reset director Garth Falconer says the popularity is critical for each the follow and ongoing nationwide discussions round future infrastructure. “We’re grateful to have worldwide recognition for our Waitematā Harbour Crossings design, plans for what we perceive can be the biggest infrastructure mission within the nation’s historical past,” he says.
Below Reset’s idea, a brand new six-lane Waitematā Bridge would arc roughly 500 metres from the present Auckland Harbour Bridge earlier than passing by means of a brief culvert on the base of the Northcote peninsula and rejoining the motorway community. Falconer says the association would “clear up the visitors points to the north of the town,” with northbound visitors utilizing the brand new bridge and the present bridge devoted to southbound motion.
Reset
The follow says its design would offer devoted public transport lanes in each instructions and reallocate two japanese lanes on the present Harbour Bridge for strolling and biking. In line with Reset, the strategy would cut back structural loading on the present bridge and allow long-awaited active-transport connections. The studio additionally states that the idea may very well be delivered “inside 5 years,” although no unbiased evaluation has been publicly launched.

Reset
Falconer estimates the proposed bridge may very well be delivered for “underneath $2.5 billion” and characterises this as “a fraction of the $40 billion value of a cross-harbour tunnel favoured by the New Zealand Transport Company on the time of the final election.” He provides that the scheme “would trigger minimal disruption to adjoining communities” and may very well be anchored by new parks at every finish, together with a strolling and biking hyperlink alongside Shoal Bay to Takapuna.
The IFLA-APR award announcement, made on the federation’s convention in Mumbai, additionally acknowledged Reset’s idea for a 3rd harbour crossing: the Causeway Bridge. In line with Reset, the concept is meant to futureproof the area by offering a western bypass linking State Freeway 20 at Waterview to Greenhithe and the northern motorway.

Reset
The follow estimates the route might scale back some journeys by as much as 5 kilometres. Falconer describes the proposed construction, roughly 10 kilometres lengthy and 30 metres extensive, as a “low-pitched, thin-line bridge” that will sit on piers reaching about eight metres above the water. Reset says the design consists of six lanes for autos and public transport, five-metre-wide strolling and biking paths, and relaxation factors for views and fishing.
The studio proposes that the bridge be constructed from low-carbon concrete to cut back embodied emissions and ongoing upkeep. Reset cites modelling suggesting that if 20 per cent of present harbour bridge customers diverted to the bypass, Auckland might scale back annual journey by 62 million kilometres and decrease emissions by 11,212 tonnes of CO₂. These figures haven’t been independently verified.
Reset estimates the Causeway Bridge at round $3 billion and says the connection might help regeneration in Seaside Haven and Birkdale. Falconer suggests the event might “allow round 3,000 new properties” and convey new employment alternatives.
“Getting Auckland transferring is greater than only a transportation challenge; it’s about how infrastructure suits into the material of the town and the harbour panorama,” Falconer says. He provides that the follow has acquired “sturdy public help” and hopes central authorities “is listening.”
Reset observe:
In 2025, NZTA targeted testing on a small substratum space east of the present Harbour Bridge for a possible tunnel or bridge.
In distinction to Reset’s successful plan, NZTA’s most well-liked bridge possibility sits arduous in opposition to the present construction on the japanese aspect – a design that will take away a part of Westhaven Marina from public use and obscure Northcote Level in addition to the enduring Auckland Harbour bridge.
The price of a harbour crossing tunnel is estimated at $20 to $40 billion. It could take an estimated 15 years to assemble and generations to pay off.
Reset web site right here.

.jpg?w=360&resize=360,180&ssl=1)









