I completed constructing by DIY concrete steps on the studio facet door! Properly, let me make clear. They’re not fully completed. I used to be so decided to get this undertaking finished over the weekend, and I used to be on monitor to just do that. So after I was outdoors yesterday night engaged on the highest step, and unexpectedly the wind began selecting up, the lightning and thunder rolled in, and it began sprinkling ever so flippantly, I made up my thoughts proper then and there that I used to be simply going to work within the rain and get it completed.
And that’s precisely what I might have finished apart from the truth that I pulled the final of the concrete pavers out of my van and instantly realized that I used to be going to be quick by a number of. And certain sufficient, I used to be precisely 5 quick. By then, it was after 8:00, so Residence Depot was closed. *Sigh* I acquired so shut, y’all. Soooo shut.
I’ll go forward and present y’all of the steps as they’re proper now, and I’ll get these final remaining 5 pavers in place right now. We’ll faux like these final 5 pavers aren’t lacking, and we’ll name this completed for now. To be clear, the constructing course of is (nearly) completed, however this gained’t be the completed look of the steps. I nonetheless have some sealing and tweaking that I need to do earlier than they’re completed completed. However that is what they appear to be with the constructing course of (nearly) completed.
I’ve instructed you that these steps are within the direct daylight all day lengthy, and you may see what I imply within the image above. I took that photograph at round 7:30am this morning, and they’re within the direct daylight till the solar goes down within the night. That’s one purpose this has taken so long as it has. I must get a kind of popup tents for outside tasks as a result of I can solely work within the direct daylight for therefore lengthy earlier than I want a break, particularly with the humidity we’ve had currently.
In that final submit about this undertaking, I had solely constructed step one, which seemed like this. Once more, all the particulars are within the submit linked simply above.

As a facet word, Tiger isn’t a DIY cat. He doesn’t perceive the idea of watching from afar. 😀 Each time I’m outdoors engaged on one thing, he’s proper there, rubbing up towards me, begging for scratches, headbutting my leg or arm, wanting to smell each product I open, strolling throughout my undertaking, and so on. He’s lovable, however my goodness, he slows me down! 😀

However again to the undertaking. Earlier than I constructed the following two steps, I needed to determine what to do to cowl or seal the uncovered OSB the place the siding had been eliminated. That siding was eliminated some time again when the plan was the construct wooden steps to match the entrance porch. I didn’t need to add siding, although, as a result of I didn’t need to add extra thickness the place these steps would sit towards the home. As a substitute, I made a decision to make use of Semco waterproof membrane. This is identical product I used to waterproof our bathe earlier than tiling. It’s a product which you could actually use to seal swimming swimming pools earlier than filling them with water. So I made a decision this is able to be a fantastic choice to seal the OSB with out including the thickness of siding.

This product is available in totally different colours, however this one goes on milky white and dries clear. I did three coats of it, and it’s such a fantastic sealer and waterproofer that it even fills these cracks the place the OSB items meet.

Whereas that was drying, I lower the retaining wall blocks for the following step, after which acquired the perimeter blocks in place.

Earlier than placing the blocks in place, I measured 11 inches from the entrance of step one to find out the place to place these blocks, after which I used my plywood template to mark the curve in order that I’d you should definitely comply with the identical curve with this step as I did with step one.

Utilizing these retaining wall stones took a whole lot of the guesswork out of the method. For the underside step, I used three full retaining wall blocks after which one mitered stone for all sides. For the second step, I used two full blocks and one mitered block. And for the highest step (which you’ll see later on this submit), I used one full block and one mitered block.

As soon as I acquired these perimeter blocks good, I adhered them to step one utilizing the identical Loctite PL500 polyurethane adhesive that I used all through this undertaking.

After which I crammed within the house contained in the perimeter blocks with extra blocks, filling in with scraps from the lower blocks the place I wanted them. Then I adhered these into place.

After which I adopted the identical steps I used for step one — filling within the voids with pea gravel to present the concrete pavers a stable floor, after which adhering the concrete pavers into place.

After which I adopted that precise course of another time for the highest step. I measured again 11 inches from the entrance of the second step, used my plywood sample to hint the curve, after which positioned the perimeter blocks, the within blocks, the pea gravel, after which the concrete pavers.

I’m so dissatisfied that I used to be 5 pavers quick. I hoped to get this construct fully completed by the point I went to mattress final night time, however that’s okay. No less than the majority of it’s completed, and I’m actually pleased with how this turned out.

I snapped a number of photos final night time, at nighttime, as a result of I used to be totally anticipating it to begin pouring down rain quickly after I went inside and I assumed the rain would make all the things look messy. So I needed to get photos of the steps whereas all the things was dry.

However in any case of that wind, lighting, and thunder, It doesn’t appear to be we acquired a single drop of rain aside from the sunshine sprinkles I felt on my arms for about two minutes whereas I used to be ending up final night time.

So I used to be additionally in a position to get photos this morning within the early morning daylight.

Like I discussed earlier than, even after I get these final 5 pavers on the highest step in place, these steps nonetheless aren’t fully completed. I nonetheless have a few issues I need to do to take them to the following stage. However earlier than I get to these steps, I’ll want an assurance that we’ll have a number of consecutive days with no menace of rain in any respect. It is perhaps every week or so earlier than we get to that time.

I’m actually so pleased with how these have turned out to date, although. Let me remind you ways this facet door has seemed for the previous few years with my scary cinder block steps. That is the image I took proper after our driveway was poured. All I had was three cinder blocks as a step down outdoors that door. Not solely did it not look good, but it surely wasn’t precisely secure, both.

And right here’s what I’ve now.

That is fairly the improve from cinder block steps!

Along with doing the ending touches on these steps, I clearly nonetheless want to complete out these areas on all sides the place the OSB continues to be uncovered. I’ve a few concepts for that, so I’ll see which one works. I actually don’t need to need to mess with siding, so I’m hoping one in every of my non-siding concepts will work. I’ll hold you posted on that as I work on the following section of this undertaking and take them from constructed to truly completed. However once more, I want a number of assured consecutive rain-free days earlier than I can try this. In the intervening time, I’m calling these steps completed (after including the final 5 paver stones) and shifting on to the following undertaking.
Extra About Our Home Exterior & Yard