UPDATE: I’ve had a number of folks ask once I plan to refinish the flooring, and if I ought to go forward and refinish the ground within the breakfast room for the reason that room remains to be unfinished. I’m going to attend on the flooring. They are going to finally all be the sunshine, pure shade that now we have in our bed room suite.
However I’m not able to deal with that venture proper now. I actually need to do all the flooring on the similar time, so that may embody the entryway/lounge, music room, kitchen, eating room, and pantry. It is going to be an enormous job, and I solely need to hire the sanders as soon as and do all of them on the similar time.
Proper now, I’m centered on getting the eating room and storage room completed, after which I hope to have a while left over this yr to get a couple of extra issues completed exterior (like getting some vegetation within the floor) earlier than winter climate hits central Texas. I’ve lower than two months to get these issues accomplished, so there’s merely no time for refinishing flooring. That must wait till subsequent yr.













